To protect the proposed apartment block, it was necessary to stabilize the slopes behind the site, and in order to protect the buildings along the rim, underpinning would be required. As construction was already underway, the remedy would have to be reliable and quick. Just two months were allocated to a specialist subcontractor to install the necessary piles and secure the slope. Grouted MAI SDA was the designer?s to retain the slope and support the buildings.