Monthly Archives: February 2011

Atlas Copco Attachments: Bridge Demolition Nonstop

For the new layout of the junction of the Federal roads 297 and 29 in Lorch, Messrs. FWA Fischer Weilheim Abbruch GmbH & Co. KG were engaged by the Stuttgart Regional Council to demolish the old bridge on the B297 crossing the B29. The two-bay bridge structure made of reinforced concrete weighed 3000 metric tons. During demolition work any damage caused to the fully closed Federal road had to be avoided at all cost.

Posted in Demolition & Recycling, Heavy Industrial Demolition, News, Reduction, Separation | Tagged , , , | Comments Off on Atlas Copco Attachments: Bridge Demolition Nonstop