Search for: %22Boomer XL3 D%22
Launching Boomer XL3 D – for large tunnels in civil engineering...
Safety, ergonomics and high productivity have been in focus when designing the Boomer XL3 D for users who prefer a traditional direct control system. The Boomer XL3 D has a...
4 Nov - 2010
Comments Off on Launching Boomer XL3 D – for large tunnels in civil engineering projects
Squeezing ground at MITHOLZ
...adit. To meet those criteria, the join venture company is using drill rigs from Atlas Copco; three Rocket Boomer XL3 C’s are backed up by two Rocket Boomer L2 C...
All eyes on Jinping
...353 E hydraulic face drilling rigs, one Boomer XL3 D and seven ROC D7 surface drill rigs. Tunneling is performed in two stages, starting with the upper 7.5 meters which...
The power behind PORCE III
The joint venture (JV) – Construções e Comércio Camargo Corrêa (CCCC) of Brazil and Conconcreto and Coninsa of Colombia – have set themselves a tough goal. They aim to stay...
On the right track
According to today’s timetable, it takes four hours to travel by rail between Oslo, the Norwegian capital, and the city of Gothenburg, on the west coast of Sweden. Thanks to...
Here:
Us: